Programming Project 3 Grading Criteria

Your program was tested with the file image1024x1024.pgm using 2 workers and chunks of size 256x256. This assignment cosisted of several parts, each with a certain number of points assigned to it out of a total 100 points. If some part was not done correctly a certain number of points were deducted. Of course, any late submission was also docked points according to the inverse log curve described in the assignment. Here is the breakdown of all penalties we applied:

  1. Old code with timings (10)

  2. Plots of timing data from the old code (20)

  3. New code with timings (20)

  4. Plots of timing data from new code (20)

  5. Report (30)

If you think have been graded unfairly, please, let us know about it before the end of Friday (June 11th). E-mail Dmitrii at dzagorod@cs and explain what the problem is.